System Overview:
The Rail Transit Power Substation Comprehensive Simulation Training System is used to train the power substation attendant and the power supply dispatchers for mastering the operation under normal, abnormal and emergency condition during duty time.
The system main body contains: the power substation attendant simulation training system, the power supply dispatch SCADA system, the integrated automation system, the physical primary main cabling simulation panel system, the fault simulation system, the primary equipment ground sand table, the secondary physical screen cabinet (such as: the main transformer protection measure and control cabinet, the feeder protection measure and control screen, the communication monitoring and control screen, the network switch monitoring and control screen, the AC/DC cabinet, the high voltage switch cabinet) and the instructor monitoring management system; the system is used to the profound technical training and evaluation for the railway traction power supply system and can be installed in the networked room for batch training. Or, the system could be constructed totally according to the actual railway power substation for deepening the trainee’s understanding of the railway power supply system and mastering the skills of the power substation routine standard operation.
System Function:
Technical Specification:
1. The system structure is based on the traction power supply system function structure.
2. The system provides various training environment.
3. The system realizes the combination of the virtual simulation software with the physical equipment.
4. The system is equipped with the comprehensive standard training content.
5. The simulated fault type is complete.
6. The system provides the auto scoring function.
Training Position:
1. Power substation attendant
2. Power supply dispatcher