Ordinary Railway Signal Comprehensive Simulation Training System

2017-08-30SHARE:

System Overview:

The system is constructed by the EI32-JD Microcomputer Interlocking System, the Frequency Shift Modulated Automatic Block System (ZPW2000A Type), the Microcomputer Monitoring System and the Centralized Traffic Control (CTC) System. It uses the physical equipment to build the ordinary railway signal system training operation environment. The system meets the requirements for the signal trainee in practicing the ordinary electric service signal system. The system is able to carry out the training for the acknowledge skill, test skill, repair skill and fault handling skill of the ordinary railway electric service signal system equipment. The training system enables the trainee to experience the on-site working environment and operation process at the training center to enhance the practice experience and operation skill and the fault analysis and trouble-shooting capability.

Training Content:

Basic operation and principle study of interlocking

Signal Equipment Acknowledge

Rail electric circuit installation and test

Introduced equipment wiring, welding, installation and inspection operation

Signal component installation and test

CTC and automatic blocking equipment installation, commissioning and maintenance

Station signal and section signal equipment installation, commissioning and maintenance

Points, switches and signal power supply equipment installation, commissioning and maintenance

Equipment performance inspection, equipment fault analysis and handling

Training Position:

Signal Staff

Station Attendant