System Overview:
The system is constructed by the EI32-JD Microcomputer Interlocking System, the Frequency Shift Modulated Automatic Block System (ZPW2000A Type), the Microcomputer Monitoring System and the Centralized Traffic Control (CTC) System. It uses the physical equipment to build the ordinary railway signal system operation environment. The system meets the requirements for the signal trainee in practicing the ordinary electric service signal system. The system is able to carry out the for the acknowledge skill, test skill, repair skill and fault handling skill of the ordinary railway electric service signal system equipment. The system enables the trainee to experience the on-site working environment and operation process at the center to enhance the practice experience and operation skill and the fault analysis and trouble-shooting capability.
Content:
Basic operation and principle study of interlocking
Signal Equipment Acknowledge
Rail electric circuit installation and test
Introduced equipment wiring, welding, installation and inspection operation
Signal component installation and test
CTC and automatic blocking equipment installation, commissioning and maintenance
Station signal and section signal equipment installation, commissioning and maintenance
Points, switches and signal power supply equipment installation, commissioning and maintenance
Equipment performance inspection, equipment fault analysis and handling
Position:
Signal Staff
Station Attendant
PREV:NO MORE
NETX:High Speed Railway Signal Comprehensive Simulation System