Rail Train Distribution Substation Comprehensive Simulation System

2017-08-30SHARE:

System Overview:

The Rail Transit Distribution Substation Comprehensive Simulation System is used to train the distribution attendant and the power supply dispatcher for mastering the operation under the normal, abnormal and accident situation during duty time.

The system provides the selectable combination physical equipment: physical primary main cabling simulation panel, high voltage switch cabinet, secondary physical screen cabinet (such as: microcomputer screen, AC/DC screen cabinet, etc.), integrated automation system, dispatch SCADA terminal and instructor monitoring administration system. The system could be installed in the networked room for batch or be constructed totally according to the distribution substation site for deepen the trainee’s understanding towards the railway distribution substation system and master of the skill for the routine standard operation of the distribution substation.

System Function:

The system almost regenerates the entire actual power distribution substation site environment for the comprehensive acknowledge of the substation overall structure and the primary and secondary physical equipment for the trainee. It realizes the trainee’s: master of the key touring point and route of the distribution substation; the operation of the breaker and the isolation switch close and remote back brake through the microcomputer screen cabinet, the integrated automation system and the SCADA system; phenomena acknowledge and trouble-shooting of the various faults of the distribution substation; scenery of the distribution substation maintenance operation.

Technical Specification:

1.        The system structure is based on the function structure of the distribution substation system

2.        The system provides various environment

3.        The system realizes the combination of the virtual simulation software with the physical equipment

4.        The system is equipped with the complete standard content

5.        The system simulated fault type is complete

6.        The system provides the auto scoring function

Position:

Distribution substation attendant

Power supply dispatcher